
Clarification vessel
HIGHLIGHTS
- Energy recovery by feed water preheating
- No fresh water used for cooling
- Low waste water temperature without steam generation
In order to avoid the build-up of deposits and materials with high consistency in the boiler vaporastion system, the steam generator must be clarified under pressure, and thus under high temperature. The hot water steam mixture may no directly enter the sewage system. For this purpose Jumag offers clarification vessels with and without heat recovery.
Clarification and continuous removal of first condensate are performed in a water seal. Using an integrated heat exchanger the energy of the clarification water and of the first condensate are transferred to fresh feed water. If the water seal temperature exceeds a cerain value, the water will be collected.













